Clapham Junction Station

Clapham Junction Station, London

As a part of the new St John’s entrance at Clapham Junction Station, Kaler Engineering undertook both the steelwork and groundworks packages. This gave our client a complete package – minimising their risk.

Kaler fabricated
  • • 4no. Bespoke Arched Canopies,
  • • 2no.Powder-coated bicycle frame,
  • • Aluminium powder coated flashings and bespoke drainage for platform canopies,
  • • Structural steelwork for Beam and Block Flooring.
In addition, our groundworks package included;
  • • Supply and installation of 20nr Stainless Steel Anti-Terrorist Bollards,
  • • Supply and installation of 30nr Stainless Steel Bollards,
  • • Supply and installation of concrete beam and block floor,
  • • Installation of Aco-drainage and associated drainage works,
  • • Installation of 50mm thick concrete slabs around forecourt,
  • • Construction of a concrete retaining structure with steps cladded with facing brickwork,
  • • Tarmac of forecourt including line marking,

Our experienced site management and onsite teams were able to co-ordinate the works and deliver an end product for our client.